Delivered on live infrastructure — often track-side, at night, under load. A cross-section of recent work across South Africa's utility, transport and enterprise networks, geo-verified on site by our crews.

OHTE mast maintenance — Metrorail corridor
Past jobs completed

Site-verified work, filtered by discipline.

Every card is a real Musi crew on a real site — timemark verified, matched to the service that delivered it. Drag or use the arrows to scroll.

Jointer working an LV termination inside an open roadside trench — heat-shrink kit, hydraulic crimping and full inventory laid out for a same-day re-energisation.

Sealing multi-run HV cable entries at a substation wall penetration — mechanical clamping, fire-stop mortar and cable-management dressing on new terminations.

Community-embedded jointing crew running PILC/XLPE terminations kerbside — full jointer's inventory, heat-shrink kits and hydraulic crimping tools staged.

Jointer preparing a copper conductor termination adjacent to a live transformer — cable-screen dressing, braid bonding and lug prep before the heat-shrink boot goes on.

Two-jointer team fitting a red HV heat-shrink stress-cone termination on an XLPE cable end — kerbside kit-up alongside an operational distribution kiosk.

Gas-torch application of a red HV heat-shrink boot over a fresh XLPE termination — controlled flame sweep for uniform recovery and full sealing.

HV cable coiled at the trench edge with sandbag ballast holding phase spacing — jointer positioning ends prior to termination and cable-mark verification.

Jointer cable-tying two parallel HV cable runs together at the base of the trench — spacing set, ties dressed and ready for the bedding sand and warning-tape layer.

Jointer working an HV termination at the base of a deep red-soil trench — shoring maintained, existing services identified and heat-shrink kit staged above the pit.

Finished HV cable joint dressed in the base of the trench — heat-shrink recovery complete, cable straightened around the existing steel service and ready for backfill sign-off.

Jointer in an open road trench dressing an LV cable termination on a shop-front kerb — timemark verified, tools laid to hand and reinstatement gang standing by for backfill.

Three red 12 kV Raychem elbow connectors seated onto the RMU bushings after a fresh XLPE termination — screen bonding checked, phase colouring intact, ready to close in.

Featured projects

Deep-dive on flagship deliveries.

01
Rail electrification

Cape Town OHTE mast maintenance

Metrorail, Cape Town · 2025

Live-corridor overhead traction equipment maintenance and reconductor work — HV disconnection, ladder access, mast-top jointing on an operational rail line.

02
Substation lift

Track-side kiosk substation install

Metrorail, Cape Town · 2025

Precision lift and commissioning of a new outdoor kiosk substation onto a rail-side plinth using Musi's Palfinger PK 23500 crane fleet.

03
Substation swap-out

Mini-sub replacement — Lawley

6302 Simelani Street, Lawley · 02 Jul 2025

Removal of a burnt-out mini-substation kiosk and full replacement — including HV cable termination, earthing, plinth prep and re-energisation.

04
Transmission lines

Concrete pole delivery & rig

Gauteng · Nov 2024

Transport and precision off-load of concrete transmission poles with the Palfinger PK 23500 truck-mounted crane for an overhead reticulation upgrade.

05
Reticulation

Parkview underground reticulation

10 Jan Smuts Ave, Parkview, Randburg · Mar 2025

Trench excavation, cable pulling and reinstatement for an underground LV reticulation upgrade in a live urban streetscape.

06
HV & LV cable jointing

Parkview cable pull & termination

10 Jan Smuts Ave, Parkview · Mar 2025

Multi-run LV cable installation with entry-point sealing and terminations, executed after-hours under temporary generator supply to keep the site live.

07
HV & LV cable jointing

Eldorado Park jointing

33 Hurricane Rd, Eldorado Park, Soweto · Jun 2025

Community-embedded jointing crew executing PILC / XLPE terminations kerbside — full jointer's inventory, heat-shrink kits and hydraulic crimping.

08
Rail substation

Rail-side kiosk substation commissioning

Metrorail · 2025

Final positioning, plinth alignment and commissioning of an outdoor kiosk substation on an active rail reserve with flagged safe-work zone.

09
Transmission lines

Johannesburg South cable stringing

Johannesburg South · Jun 2025

Substation yard cable stringing and drum-out for an HV transmission tie-in — includes duct preparation, drum stands and pull-through rigging.

10
Rail electrification

Western Cape rail corridor OHTE fleet

Metrorail · 2025

Musi Palfinger PK 23500 fleet deployed on rail corridor for OHTE mast replacement and heavy lift operations.

11
Logistics & rigging

HV kiosk transport & rig-down

Gauteng · 2025

Load-out of decommissioned HV kiosks for refurbishment with Musi's own transport and lifting equipment.

12
Substation lift

Track-side substation lift

Cape Town · 2025

Precision crane lift of a new outdoor kiosk substation onto a rail-side plinth with live-line HV disconnection.

13
Substation swap-out

Mini-sub replacement programme

Johannesburg South · 2025

Removal and replacement of aged mini-substations, including HV cable jointing, terminations and commissioning.

14
Reticulation

Township reticulation upgrade

Gauteng · 2024

Underground reticulation upgrade with youth-hire model and community access negotiation.

15
Fibre backbone

Municipal fibre backbone extension

Gauteng municipality · 2024

Backbone fibre optic build with fusion splicing, OTDR testing and campus network cutover.

16
Solar PV

Commercial rooftop PV plant

Johannesburg · 2024

Design, feasibility and construction of a commercial rooftop PV system with grid interconnection.

Case study on request

We can share detailed case studies under NDA — including scope, methodology and delivery timelines.