Team-hauled cable pull along the Johannesburg CBD kerb-line as part of a downtown reticulation upgrade — coned lane, pedestrian marshalling and continuous drum feed.






Projects
Delivered on live infrastructure — often track-side, at night, under load. A cross-section of recent work across South Africa's utility, transport and enterprise networks, geo-verified on site by our crews.
Site-verified work, filtered by discipline.
Every card is a real Musi crew on a real site — timemark verified, matched to the service that delivered it. Drag or use the arrows to scroll.
Deep-dive on flagship deliveries.
Cape Town OHTE mast maintenance
Live-corridor overhead traction equipment maintenance and reconductor work — HV disconnection, ladder access, mast-top jointing on an operational rail line.
Track-side kiosk substation install
Precision lift and commissioning of a new outdoor kiosk substation onto a rail-side plinth using Musi's Palfinger PK 23500 crane fleet.
Mini-sub replacement — Lawley
Removal of a burnt-out mini-substation kiosk and full replacement — including HV cable termination, earthing, plinth prep and re-energisation.
Concrete pole delivery & rig
Transport and precision off-load of concrete transmission poles with the Palfinger PK 23500 truck-mounted crane for an overhead reticulation upgrade.
Parkview underground reticulation
Trench excavation, cable pulling and reinstatement for an underground LV reticulation upgrade in a live urban streetscape.
Parkview cable pull & termination
Multi-run LV cable installation with entry-point sealing and terminations, executed after-hours under temporary generator supply to keep the site live.
Eldorado Park jointing
Community-embedded jointing crew executing PILC / XLPE terminations kerbside — full jointer's inventory, heat-shrink kits and hydraulic crimping.
Rail-side kiosk substation commissioning
Final positioning, plinth alignment and commissioning of an outdoor kiosk substation on an active rail reserve with flagged safe-work zone.
Johannesburg South cable stringing
Substation yard cable stringing and drum-out for an HV transmission tie-in — includes duct preparation, drum stands and pull-through rigging.
Western Cape rail corridor OHTE fleet
Musi Palfinger PK 23500 fleet deployed on rail corridor for OHTE mast replacement and heavy lift operations.
HV kiosk transport & rig-down
Load-out of decommissioned HV kiosks for refurbishment with Musi's own transport and lifting equipment.
Track-side substation lift
Precision crane lift of a new outdoor kiosk substation onto a rail-side plinth with live-line HV disconnection.
Mini-sub replacement programme
Removal and replacement of aged mini-substations, including HV cable jointing, terminations and commissioning.
Township reticulation upgrade
Underground reticulation upgrade with youth-hire model and community access negotiation.
Municipal fibre backbone extension
Backbone fibre optic build with fusion splicing, OTDR testing and campus network cutover.
Commercial rooftop PV plant
Design, feasibility and construction of a commercial rooftop PV system with grid interconnection.
